| RHINO, a large and powerful demining tool geared towards large clearance operations, has been put to the test—both on testing grounds and in the field. The result: a level of performance and operability that alleviates the concerns of critics. |
Background
The mechanical demining system RHINO was developed internally by Rheinmetall
Landsysteme GmbH (RLS) in Kiel, Germany, to provide a more cost effective and
safe demining tool. It is superior to existing systems in terms of efficiency,
safety and clearing capacity and is especially well suited for large area demining
operations. RHINO is large (9.5 m long, 3.1 m wide and 3.5 m high), powerful
(660 kW caterpillar engine), robust (weighs 58 metric tons) and is fully remotely
controlled. RHINO is a serious demining machine, as opposed to a mechanical
machine whose purpose it is to assist the manual deminers.
This article summarizes RHINO and the user experience during a field test and
subsequent demining task conducted in Cambodia from August 1999 to May 2000.
The test and the accompanying demining task in support of CARE took place in
two remote areas in Battambang province. The main objective of the task was
to accelerate the demining process
to help accommodate the need for land for returning refugees. This was a major
two year project involving the resettlement of approximately 4,000 families.
The Cambodian Mine Action Center (CMAC), a state run organization, is responsible
for the conduct of mine clearance actions. The CMAC staff is assisted by international
advisors from the United Nations, NGO, as well as soldiers from countries such
as Canada, Australia, Belgium and the Netherlands. The test and subsequent demining
action were managed and performed by CMAC with the technical assistance of two
RLS employees. After the initial training, their role was mainly to provide
further training on the job for tasks such as unscheduled maintenance. Mine
clearing in Cambodia represents a serious challenge. The environmental conditions
are tropical and severe. The infrastructure is typical of a developing country.
The mine problem itself is further complicated by the fact that there are numerous
types of mines and UXO, and poorly marked mine infested areas.
![]() |
|
RHINO with dozer blade is transported to the test area, just bypassing a bailey bridge. c/o RHINO |
Operation by Indigenous
Personnel
Training on the RHINO began when it arrived by barge at Sihanoukville. The RLS
technicians trained three mechanics and two electricians in the operation and
maintenance of the RHINO. While lacking theoretical knowledge, the trainees
were skilled workers and eager to learn. In a few short days they could handle
the day-to-day operations and, soon after, maintenance of the vehicle. In a
few weeks, they operated the system without the oversight of the RLS technicians.
The five trainees were organized in two operation/ maintenance teams of two,
each with the fifth being responsible for supply operations.
The challenge of leading the demining platoon was given to a CMAC technician
who was assisted by a former leader of a mine marking team. They were initially
trained and supervised by a French technical advisor. Manual deminers, drivers
and guards rounded out the team. The platoon not only clearly demonstrated
that indigenous personnel could operate and maintain the RHINO, but that they
also work hard and perform in a highly proficient manner throughout the initial
test and subsequent tasks.
Infrastructure
There is no question that mechanical demining machines are huge. The concern
is that they are too big to be transported and will damage the infrastructure
of developing nations. While the RHINO is a big machine, ingenuity will go a
long way to solve most transportation problems. The infrastructure of Cambodia
is especially weak from our point of entry (Sihanoukville) to the test area
(approximately 600 km) and another 80 km to the operational site. The vehicle
made the trip to the test area mostly on board a trailer and by rail. The critical
parts of the roadway and under sized bridges were by passed through use of the
Cambodian railway and by driving the vehicle under its own power. The RHINO
traveled some 140 km of the trip at about 4 km per hour. The tiller unit, which
weighs 14 tons but is easy to remove, was replaced by the dozer blade. As a
result, the trip was made without damage to roadway and bridges. The RHINO was
able to tow a truck that had been stuck in the road and upright a huge truck,
which had overturned because of overloading and very large potholes in the road.
Concerns about RHINO
![]() |
|
First lane towards vegetation during operation. c/o RHINO |
The critics of mechanical
demining might argue that the RHINO is not well suited for the task because
it is:
• too complex to be operated by indigenous personnel;
• too heavy and bulky to be transported and damaging to the infrastructure;
• unable to recover if stuck in muddy or swampy ground;
• not useable in a tropical environment with dense vegetation, high temperatures,
high humidity, soft ground and large termite hills;
• not able to clear at an acceptable rate and quality;
• not survivable against AT mines, UXO and especially booby traps; and
• too costly to operate.
Self-Recovery
The RHINO was bogged down twice in muddy, swampy terrain. Two methods of self
recovery: • In the first case, the vehicle was bogged down in a mine infested
area. In accordance with regulatory
procedures, two manual deminers had to clear the surrounding area before the
recovery work could commence. An anchor was built by means of a steel plate
and long iron rods. A rope
was fixed on the anchor as well as on an iron bar, which was fixed to the track
plates at the rear of each track. With this arrangement the RHINO was able to
tow itself out of the mud.
• In the second case, the tiller unit was forced downwards in the ground to elevate the system while the rear of the RHINO track formed the second base of the vehicle. Stones and wooden blocks were placed underneath to provide the RHINO with traction to allow it to be driven out of the mud.
![]() |
|
HINO bogged down before self-recovery. c/o RHINO |
Operation in a Tropical Environment
The RHINO was designed to operate in a tropical environment, so the high temperature
and humidity, dust and very heavy rain in Cambodia did not have an adverse impact
on it. The RHINO proved its ability to work through huge termite hills as well
as dense vegetation including any kind of bamboo. Trees up to 20 cm in diameter
were processed by RHINO. All materials are ground between the two tilling drums.
Some of the vegetation was worse than anticipated, almost inaccessible due to
thick vines and trees up to 30 cm in diameter. RHINO was slowed down but not
stopped. The grinding process continued. While our customer in Croatia clears
20,000 m2 per day, RHINO was able to clear 4,000-6,000 m2 per day in a very
challenging environment. This is significantly more than a platoon of manual
deminers can clear in a week. We learned that RHINO’s level feelers, which control
the clearing depth, needed stronger protection for driving in reverse in such
a challenging environment as Cambodia.
Quality Rate
The situation in Cambodia confirmed the operational results of our customer
in Croatia who has cleared some 2 million m2 in just over a year without a single
mine found intact in the treated soil. PMN mines without boosters were used
in the Cambodian test to get information regarding the size of residuals of
mines, which could not detonate. All mines treated during the special test were
destroyed completely. All parts in the treated soil are passed through the small
gap between the rotating drums. After successful completion of the test CMAC
Risk Assessment Committee agreed to place the system into operation.
After RHINO cleared the first area, the area was checked completely by manual
deminers in accordance with regulatory procedures. As a result of this first
recheck and test results, the manual recheck was reduced by 50 percent. Only
harmless mine residuals and fragments were found by the manual deminers.
Survivability
The RHINO got a chance to demonstrate its survivability characteristics
early in the severe conditions in Cambodia. During the first week of operation,
a booby trap consisting of two AT mines detonated at approximately 30 cm under
RHINO’s left track. Later, a single AT mine detonated between the two tiller
drums near the bearings, and another AT mine detonated under RHINO’s right track.
In less than two days, the detonations from the single mines were repaired in
the field by the CMAC maintenance personnel. The double mine explosion caused
more severe damage to mechanical parts and was repaired in the field in about
a week.
There was no threat to human life with these explosions because the RHINO is
unmanned and remote controlled. An operator sitting in the cab of any manned
clearing system would have been severely injured or killed by the double mine
explosion.
Too Costly to Operate?
RHINO’s deployment in Cambodia has demonstrated that if the system is used
as intended and is operated in a day-to-day demining operation, its clearance
speed is outstanding. Our cost study can demonstrate the cost effectiveness
of RHINO when compared to a manual demining operation.
• can be operated and maintained by indigenous personnel after a qualified training
on the job.
• can be transported without damaging the infrastructure, even under the conditions
of a developing country, by smart and flexible use of the available resources.
• disposes of sufficient self recovery means even in real swampy ground.
• is working reliably also in tropical environment.
• is one of the first reliable demining machines, which is much more efficient
than manual deminers , and which
makes manual rechecking of the ground unnecessary.
• has an outstanding survivability against AT mines, UXO and booby traps and
offers excellent safety due to its remotely controlled operation.
• will speed up the demining process and reduce the costs per square meter.
![]() |
|
PMN mines crushed during testing. c/o RHINO |
Conclusion
RHINO is a real demining machine. In the Cambodian operation, it has proven
to be both safe and cost effective. If the world is going to make a serious
progress in solving its mine problem in a reasonable time frame, cost effective
and efficient demining systems such as the RHINO must be part of the solution.
The crucial requirements to use the RHINO are an open mind, good planning, logistic
as well as site management ,and the international will to set up a long lasting
demining project with multinational sponsorship.
Contact Information
Manfred Joehnk, Program Manager Rheinmetall
Landsysteme GmbH
Falckensteiner Str. 2, D-24159 Kiel,Germany
Phone: +49 431 3999 2292
Fax: +49 431 3999 3278
Mobile: 0171 7217649
E-mail: Birgit.Baumgart@rheinmetall-s.com
Website: www.rheinmetall-ls.de