Equipment Specific Considerations to T&E > Detection > General
Subject
Test plan, operator effect
Experience/Advice
The test plan should include procedures to minimise the operator effect, such as memorization of test target locations. In order to reduce memorization of test target locations a certain operator should preferably only cover a particular test lane once a day and not start the following day with the test lane processed as ultimate lane the day before.
Reference
D.M. Reidy, Handheld Metal Detectors: Nicaraguan Field Test Report, U.S. Army Communications Electronics Command (CECOM), NVESD, 2001