Database of International
Experiences in Support of the
Test and Evaluation Community
(DIETEC)
Experience
Category
Equipment Specific Considerations to T&E > Detection > Metal
Subject
Test plan, verification of a detection
Experience/Advice
In case test targets are not left in place after testing and excavated, it is good practice to re-measure their positions (using the same measurement device) and compare them to the original position readings for quality assurance. The final test target positions should be used as ground truth against which the detector declarations (operator markings) are scored.
Reference
D.M. Reidy, Handheld Metal Detectors: Nicaraguan Field Test Report, U.S. Army Communications Electronics Command (CECOM), NVESD, 2001