Database of International
Experiences in Support of the
Test and Evaluation Community
(DIETEC)
Main/Browse  Search  Login  New User

Browse Experiences

 
  Next 30 Experiences
Category Path [sort] Subject [sort] Date
added
 [sort]
Author [sort] Views
Equipment Specific Considerations to T&E > Detection > General  Definition of test objectives and operating theatre  2/14/2004  ITEP Secretariat (ITEP) 5172 
Equipment Specific Considerations to T&E > Detection > General  Equipment shakedown and calibration  2/14/2004  ITEP Secretariat (ITEP) 5217 
Equipment Specific Considerations to T&E > Detection > General  Pre-trial selection  2/14/2004  ITEP Secretariat (ITEP) 5171 
Equipment Specific Considerations to T&E > Detection > General  Preparation, input from manufacturers  2/14/2004  ITEP Secretariat (ITEP) 5207 
Equipment Specific Considerations to T&E > Detection > General  Soil characteristics  2/14/2004  Dieter Guelle (ITEP Secretariat) 4031 
Equipment Specific Considerations to T&E > Detection > General  Test area, soil  2/14/2004  ITEP Secretariat (ITEP) 5255 
Equipment Specific Considerations to T&E > Detection > General  Test design, operator effect  2/14/2004  ITEP Secretariat (ITEP) 5057 
Equipment Specific Considerations to T&E > Detection > General  Test design, user involvement  2/14/2004  ITEP Secretariat (ITEP) 3840 
Equipment Specific Considerations to T&E > Detection > General  Test plan, equipment running cost  2/14/2004  ITEP Secretariat (ITEP) 5195 
Equipment Specific Considerations to T&E > Detection > General  Test plan, flexibility  2/14/2004  ITEP Secretariat (ITEP) 4105 
Equipment Specific Considerations to T&E > Detection > General  Test plan, operator effect  2/15/2005  Franciska Borry (ITEP Secretariat) 3676 
Equipment Specific Considerations to T&E > Detection > General  Test plan, other than performance related factors  2/15/2005  Franciska Borry (ITEP Secretariat) 3776 
Equipment Specific Considerations to T&E > Detection > General  Test result comparisons, test site changes  2/14/2004  ITEP Secretariat (ITEP) 3985 
Equipment Specific Considerations to T&E > Detection > General  Test site requirements, target burial clues  2/15/2005  Franciska Borry (ITEP Secretariat) 4876 
Equipment Specific Considerations to T&E > Detection > General  Test targets, burial depth  2/14/2004  ITEP Secretariat (ITEP) 3809 
Equipment Specific Considerations to T&E > Detection > General  Test targets, burial depth changes  2/14/2004  ITEP Secretariat (ITEP) 4075 
Equipment Specific Considerations to T&E > Detection > General  Test targets, type  2/14/2004  ITEP Secretariat (ITEP) 4039 
Equipment Specific Considerations to T&E > Detection > GPR  Soil disturbance  3/19/2004  Franciska Borry (ITEP Secretariat) 4075 
Equipment Specific Considerations to T&E > Detection > GPR  Test result comparisons, environmental factors  2/14/2004  ITEP Secretariat (ITEP) 4087 
Equipment Specific Considerations to T&E > Detection > GPR  Test result comparisons, environmental factors  3/19/2004  Colonel Dyck (MineTech International) 4069 
Equipment Specific Considerations to T&E > Detection > GPR  Test site layout, soil disturbance  2/14/2004  ITEP Secretariat (ITEP) 4140 
Equipment Specific Considerations to T&E > Detection > Metal  Test design  8/5/2005  Mate Gaal (BAM) 4862 
Equipment Specific Considerations to T&E > Detection > Metal  Test design, environmental data records  2/14/2004  ITEP Secretariat (ITEP) 4069 
Equipment Specific Considerations to T&E > Detection > Metal  Test design, operator effect  2/14/2004  Franciska Borry (ITEP Secretariat) 4052 
Equipment Specific Considerations to T&E > Detection > Metal  Test plan, definition and marking of a detection   2/15/2005  Franciska Borry (ITEP Secretariat) 5214 
Equipment Specific Considerations to T&E > Detection > Metal  Test plan, number of test lane sweeps  2/16/2005  Franciska Borry (ITEP Secretariat) 3974 
Equipment Specific Considerations to T&E > Detection > Metal  Test plan, operator training  2/15/2005  Franciska Borry (ITEP Secretariat) 3708 
Equipment Specific Considerations to T&E > Detection > Metal  Test plan, operator training   2/15/2005  Franciska Borry (ITEP Secretariat) 3953 
Equipment Specific Considerations to T&E > Detection > Metal  Test plan, supervision of test personnel  2/16/2005  Franciska Borry (ITEP Secretariat) 3920 
Equipment Specific Considerations to T&E > Detection > Metal  Test plan, verification of a detection   2/15/2005  Franciska Borry (ITEP Secretariat) 3766 
  Next 30 Experiences
  JMU Home
horizontal rule
 CISR Home   Last Revised: 1/20/2004   Publisher: CISR    Contact: CISR@jmu.edu